Commit Graph

9 Commits

Author SHA1 Message Date
Jen 0ab7fc9ecc Update open graph image 2018-11-13 17:29:29 -05:00
Seth Vargo 26f59f1b05
Update logos 2017-04-18 13:59:09 -04:00
Seth Vargo ee6921f1b6
Add open-graph stuff 2017-04-06 18:11:50 -04:00
Seth Vargo b56c0d37d8
Add press-kit and hashicorp logo 2017-04-06 17:33:57 -04:00
Seth Vargo 0d7d65fdeb
Rebrand to match HashiCorp styles 2017-03-27 21:24:57 -04:00
Jason Costello e8eb4626f6 Update logo 2017-02-23 16:37:57 -08:00
Jason Costello 981c6f06bb Visual design changes to header
The original text over the busy image is a bit hard to read. This
commit moves the tagline below and slightly reduces the size of the
image to make room
2017-02-23 15:43:03 -08:00
Seth Vargo 1ae499670e Add structured data 2016-01-24 13:01:44 -05:00
Seth Vargo 5093f3120e Merge docs and www into a single static site
This is a big commit, and I apologize in advance for the future
git-blames all pointing to me. This commit does a few things:

1.  Merges the website/docs and website/www repo into a single website repo
    to be in line with other HashiCorp projects
2.  Updates to use middleman-hashicorp
3.  Converts less to scss to be in line with other projects
4.  Updates page styles to be in line with other projects
5.  Optimizes images
6.  Prepare for S3 + Fastly deployment with scripts, etc.
7.  Removes blog posts (they have been transferred to hashicorp.com with
    redirects in place
8.  Updated sitemap generation script for better SEO
9.  Fixed many broken links
10. Add description to all fields
2016-01-19 14:35:05 -05:00